Tola - logs beeing prepared for export by taking away the outside rim 

Transport of a band resaw delivered to a customer in Tanzania . The forklift is slightly overdimensionned isn't it ? 

PRIMULTINI @ LIMHOUT. 

Some very brave Congolese workers seem to have troubles with a log lying in their way . 

FULLPOWER band resaw FTF-900  N and SWEED CE 300 + father & our youngest daughter

moving in Kinshasa is not always very easy 

Inside a sawmill we are shipping out to Canada, collecting the sawdust is done the good old American style 

dismantling a sawmill in Germany is not necessarily an easy job 

2011-2013

Since we moved the company end of 2001, litle time was spent on keeping the SEYNA website updated about our evolutions. .

 

In this period of time, Europe came across some pretty heavy economic storms .

Bigger vessels had hard times, small boats like ours have found a safe harbour for shelter.

 Exports to africa have brought us the biggest orders in our 25 years of history.  

 

1)    For the SBL sawmill in Lastourville, we have embarked 3 containeurs containing 2 complete cutting lines WRAVOR all new and made to size to cut the bigger African logs.  To make sure we had the blades in good condition, a complete sawdoctoring room was loaded as well Complete with automated bench OPTIMATIC, SHARK full flood grinder and VANINETTI satellite tipper .  

 

2)    In September 2012, ou customer FOREEX in Libreville could confirm payment of the whole new sawmill which has been studied for 4 years. The mill was designed for cutting the hardest and the biggest African logs up to 10 meters of length.         

We have supplied :

- 2 x prefab building off which 1 was equipped with an overhead crane carrying 10 tons on a span of 22 meters.  

- 3 x MANITOU forklift and reach truck

- Complete sawdoctoring room, all equipment for bundling and conservation of sawn woods , etcetera.

- The cutting line PRIMULTINI 1600 SIF/CIB complete with log handling and board conveyors  PRIBO,

The carriage has an horizontal opening of 1,8 meters and weighs 24 tons when fully assembled.   

 

We ended up with 6 containers containing the buildings + 3 x RO RO freight for the forklifts. Another #7 OPEN TOP containers + 1 flat rack have left from Italie directly to LIBREVILLE containing the PRIMULTINI – PRIBO equipment.

 

Our division SWEED CHOPPERS could sell into Europe some important orders.  For Spain we delivered equipment  to chop very big high tension electric cables + sorting aluminium from steel core.

In France we sold many choppers to fit the line that will clean up the underwater communication cables . these cables are quit difficult to recycle because they are made of # 04 different layers of different material . SWEED machines have made it possible.

The line should recycle some 120.000 km (and this is no typing error) in the next 5 years.

 

SEYNA has its eyes open for the challenges the new year will bring and we hope our customers can enjoy same positive vibes in 2014 all in good health.

 

 
SEYNA nv
Wagenaarstraat 43
8791 Waregem/Beveren-leie
Tel: +32 56 77 75 17
info@seyna.com
© 2012 | Webdesign by RedBit.agency  |  SEO & SEA by RedBit.agency | mobile